Documents

Videos

October 30, 2025: Video – Bar Mills Decommissioning Draft Study Report Meeting held at the Hollis Town Office.

October 10, 2022: Video – The Bar Mills Dam Decommissioning Proposal: A Conversation with Brenton Hill of the Buxton-Hollis Historical Society

August 2, 2022: Video – Buxton Town Meetings – Buxton Dam/Public Meeting

February 7, 2017: Video – The History of Buxton’s Bar Mills Village with Brenton Hill of the Buxton-Hollis Historical Society

 

Written Documents

Date Title Description Format Size
6/4/2026 Draft Surrender Application and Decommissioning Plan A cover letter and supporting documentation discussing BWPH’s draft surrender application and decommissioning plan for the Bar Mills Project. PDF 17MB
10/22/2025 Draft Study Report Cover Letter A cover letter accompanying the draft study report. PDF 234KB
10/22/2025 Draft Study Report Executive Summary An executive summary of the contents of the draft study report. PDF 80KB
10/22/2025 Draft Study Report A report which summarizes baseline data at the Project related to geology and soils, water quality and quantity, fish and aquatics, wildlife and botanical resources, recreation, land use, aesthetics, and historical structures. PDF 16MB
10/22/2025 Appendix A An appendix of the draft study report detailing BWPH’s meetings with volunteer representatives of the towns of Buxton and Hollis. PDF 456KB
10/22/2025 Appendices (A-H) Combined All supporting documentation of the draft study report. PDF 80MB
8/28/2023 Bar Mills Final Study Plan A plan detailing the studies BWPH planned to conduct in 2023 and 2024 in support of decommissioning efforts. PDF 3MB
6/1/2023 Bar Mills Draft Study Plan A draft Study Plan based on agency and public consultation and comments completed as of the date of issuance. PDF 2MB
8/2/2022 Public Informational Meeting Presentation PDF 5MB
8/3/2022 Decommissioning Scoping Document A early document which provided federal and state agencies, abutting property owners, and the general public with, among other things, a summary of the existing Project, preliminary resource concerns, and an opportunity to comment. PDF 2MB
10/21/2021 Update on Surrender Process Schedule Brookfield White Pine Hydro update to FERC on the license surrender schedule and process. PDF 100KB
11/30/2020 Notice of Intent to Surrender License Brookfield White Pine Hydro correspondence to FERC of the intention to surrender the license. PDF 67KB

 

Revision Date: 6/4/2026